Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the imagify domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/forge/seotoburn.com/public/wp-includes/functions.php on line 6114
Preparing the Floor for a Vinyl Flooring Installation – Renovate VIP

When laying a new floor, you will need to remove all furniture and appliances from the room. Do not attempt to merely move furniture from one side to the other because you will need space in which to maneuver. Also, the floor will need some time to set once it is installed. So move out anything that isn’t attached.

Cement Basement Floor

 

Removing Moldings and Trim

Remove the shoe moldings, trim pieces, door thresholds, and floor grates carefully, using a pry bar and a scrap of wood for a leverage wedge so as not to mar the baseboard. This will enable you to fit the flooring right up to the baseboard. Any minor imperfections along the cut edge of the new flooring will be hidden underneath the molding when you replace it.

Woman Vinyl Flooring

 

Preparing the Underlying Floor

The underlying floors need to be smooth and free of grease, dirt, and any irregularities. Clean the floor well.

If your floor is level, dry, and structurally sound, with an even finish, you will need no other prep work than to sweep and vacuum thoroughly, then mop the floor with a mild cleaner. If the flooring will have a seam, the 6” strip of floor directly under the seam should be very clean and free from any wax or finish so the adhesive will have something to hold on to. Use a heavy-duty detergent or wax remover to clean this strip.

Addressing Floor Irregularities

If the floor is badly sloped or dipped, fill those areas in with leveling compound. Install an underlayment of 1/4” plywood. Plan the seam so they do not match those of the flooring underneath.

Installing Over an Open Joist System

Over an open joist system, first apply a layer of 3/4” tongue-and-groove plywood as a subfloor. Check local code for specific recommendations. Nail the underlayment with 6 penny ring shank nails every 4” to 6” around the edge and every 4” in the middle. Check local code on this requirement as well. Leave a 1/4” gap at the baseboard and 1/16” between sheets to allow for the expansion and contraction of the wood.

Leave a Reply

Your email address will not be published. Required fields are marked *