Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the imagify domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/forge/seotoburn.com/public/wp-includes/functions.php on line 6114
Ceramic Tile Underlayment – The Basics – Renovate VIP

Ceramic tile material is rigid and relatively brittle, so a sturdy base is the most critical part when installing this type of tile. Unless you want to see cracked tiles, loose tiles, or loose grout, you need to select the proper underlayment. Underlayment is what the construction trade calls the layer that goes between your wood subfloor and your tiles.

You have several alternate ways to accomplish a strong underlayment required for ceramic tile installation.

1) Plywood

layer-plywood

Just a single layer of plywood isn’t rigid enough to stop floor deflection, it needs to be covered with an additional layer of exterior-grade plywood to achieve a total thickness of at least 1 1/8 inch. You can either cover the plywood with a cement backer board (more on these below) or cover the existing plywood with a second layer of exterior grade plywood, under either of these, a thin-set mortar is applied to eliminate air gaps. Additionally, in bathrooms, it’s recommended to lay a “shower pan” over your wood subfloor, this refers to thin rubberized materials that protect the tile from floor expansion and contraction due to moisture, temperature, and humidity.

2) Cement Backer Board

Backer-Board

These are prefabricated, lightweight concrete sheets used to cover wood subfloors, it has a dense Portland concrete core and fiberglass surfaces on both sides and can withstand prolonged exposure to moisture. Brand names include DUROCK, UTILICRETE, WONDERBOARD, and GLASCRETE.  Joints of the backer board sheets should be staggered such that they don’t fall directly over the wood subfloor joints.

3) Mortar Bed

mud-bed

Mud beds, or mortar beds, are used by professional tile contractors mostly. They’re composed of a layer of thick roofing felt, then wire mesh, followed by a layer of mortar. The reason it is used mostly by the specialists is that it takes a high level of skill and practice to ensure the mortar bed produces a sufficiently level surface. The other reason is that it is the best foundation possible for a ceramic tile floor.

Okay, but why? Because the mortar bed has a built-in reinforcement against floor deflections in the form of the wire mesh. Translation- less cracked tiles and loose grout, and longer-life flooring.

4) Concrete Slab

laying-tile

You can lay your ceramic tile directly on concrete slab, but all cracks and holes need to be refurbished prior to the installation of a tile when it’s directly bonded to the concrete. Some concrete slab has been coated with curing compound to help the slab set without cracks. This compound should be removed before tile installation to ensure a long-lasting mortar bond since the compound helps the concrete retain moisture and in some cases affects adhesiveness. It is also important that the slab is level as possible, especially with the larger tile sizes in use today. Cleaning the concrete completely of debris and dust will also contribute to a higher quality installation, in short, preparation of the surface is key.

5) Existing Flooring

One other possibility is laying the tile over existing flooring. there are a few things to consider. Is your existing floor solid, flat and in good shape? Is it stuck well enough to the subfloor under it to provide support? Good.

Is the existing floor linoleum or vinyl? Not so good, you need to strip it out or put a good subflooring on top of it. Watch out for older vinyl flooring, which may contain asbestos fibers. You don’t want to strip this stuff out yourself. Instead, either cover it up with some plywood subfloor or have a contractor remove it. If you aren’t sure if your flooring has asbestos, call in a trained asbestos inspector.

If you have ceramic tile on the floor you can lay newer tile on top of it as long as its surface is level and not too smooth. You might need to sand the surface to let your bonding have a better chance.

Tile-flooring

In conclusion, a little planning and thought will go a long way toward making your tile installation project a long-lasting addition to your home.